95 Express Phase 3

Broward at 95 PD&E Study click here for information

The Florida Department of Transportation (FDOT) is implementing Phase 3 of the 95 Express Lanes continuing 29 miles north from Stirling Rd. in Broward County to Linton Blvd. in Palm Beach County. The purpose of the 95 Express Lanes is to improve mobility, relieve congestion, provide additional travel options, enhance transit services, accommodate future growth and development in the region, enhance emergency evacuation, and improve system connectivity between key limited access facilities in South Florida. 95 Express is part of a regional network of express lanes that will provide a safe, efficient, and reliable transportation alternative to drivers traveling throughout South Florida.

The Phase 3 project limits were evaluated as three individual Project Development and Environment (PD&E) studies. The studies were conducted from Stirling Rd. to Oakland Park Blvd. in Broward County; from Oakland Park Blvd. in Broward County to Glades Rd. in Palm Beach County; and from Glades Rd. to Linton Blvd. in Palm Beach County. In order to expedite the construction of the 95 express lanes in Southeast Florida, FDOT combined the results of all three studies into Phase 3.The improvements in Phase 3 will be implemented in segments due to funding limitations. The first segment (3A-1 from south of Broward Blvd. to north of Commercial Blvd., and 3A-2 north of Commercial Blvd. to SW 10th St. in Broward County) is under construction. The second segment (3B-1 from south of SW 10th St. to south of Glades Rd.) began construction in early 2018. The third segment (3B-2 south of Glades Rd. to Linton Blvd.) is scheduled for construction in 2020. A key component of Phase 3 is a potential direct connection between northbound and southbound 95 Express and I-595, to and from the west. This direct connect will be included in the Phase 3C limits of 95 Express Phase 3. Segment 3C is the fourth segment with limits from Stirling Road to south of Broward Blvd on I-95 and along I-595 from SR 7/US 441/Turnpike Interchange to I-95.  Phase 3C will begin construction in 2019. Additionally, a continuation of Ramp Signaling will be included as part of this project up to Linton Blvd. in Palm Beach County.

Please click here to download the Project Fact Sheet

PROPOSED IMPROVEMENTS & CONCEPTS

File NameDate Added / UpdatedFormatLink
Phase 3B-2 Summary of Scope – I-953/19/18PDFDownload
Phase 3B-2 Summary of Scope – Glades3/19/18PDFDownload
Phase 3B-2 Summary of Scope – Linton3/19/18PDFDownload
Phase 3B-2 Summary of Scope – Clint Moore3/19/18PDFDownload
I-95 Express Phase 3 Typical Sections8/15/2014PDFDownload
Phase 3C North Improvements3/2/2017PDFDownload
Phase 3C South Improvements3/2/2017PDFDownload
Phase 3C 595 Improvements3/2/2017PDFDownload
Phase 3 Ingress and Egress Points3/2/2017PDFDownload

RESOURCES

File NameDate Added / UpdatedFormatLink
Fact Sheet 2018-2-212/27/2018PDFDownload
Fact Sheet 2017-10-1710/30/2017PDFDownload
Fact Sheet Detailed 2016-09-14 3 Pages2/15/2017PDFDownload
Fact Sheet Express Lanes Benefits 2016-10-2111/3/2016PDFDownload
Ramp Signaling Informational Fact Sheet4/2/2014PDFDownload
Ramp Signaling Frequently Asked Questions4/2/2014PDFDownload
Ramp Signaling Informational Brochure4/2/2014PDFDownload

PRESENTATIONS and MEETINGS

File NameDate Added / UpdatedFormatLink
95 Express Phase 3B-2 Public Workshop Presentation 2018-03-143/19/2018PDFDownload
95 Express Phase 3C Public Workshop Presentation 2017-11-0811/13/2017PDFDownload
95 Express Phase 3C Public Workshop Display – roll plot11/13/2017PDFDownload
95 Express Phase 3C Public Workshop Display – roll plot north11/13/2017PDFDownload
95 Express Phase 3C Public Workshop Display – roll plot south11/13/2017PDFDownload
I-95 Express Phase 3C Public Workshop 2017-11-0810/30/2017PDFDownload
I-95 Express Phase 3C Industry Forum Presentation4/25/2017PDFDownload
I-95 Express Phase 3 C Industry Forum Registration List4/25/2017PDFDownload
I-95 Express Ph3B Public Workshop Presentation 2016-10-2711/3/2016PDFDownload
95 Phase 3B Summary of Project 2016-10-27 Public Workshop11/3/2016PDFDownload
95X3B Express Lanes Entrance Exits11/3/2016PDFDownload
Roadway Typical Section 95X3B11/3/2016PDFDownload
Roll Plot 953B Clint Moore Public Workshop 2016-10-2711/3/2016PDFDownload
I-95 Express Phase 3B-1 Industry Forum Summary6/14/2016PDFDownload
I-95 Express Phase 3B-1 Industry Forum Presentation5/17/2016PDFDownload
I-95 Express Phase 3B-1 Industry Forum attendees list5/17/2016PDFDownload
I-95 Express Phase 3A Industry Forum Attendees List7/24/2014PDFDownload
I-95 Express Phase 3A Industry Forum Presentation7/18/2014PDFDownload

OTHER RELATED DOCUMENTS

File NameDate Added / UpdatedFormatLink
South Florida Regional Express Lanes Network Project Status Map6/16/2014PDFDownload

PROJECT DEVELOPMENT & ENVIRONMENT (PD&E;)

File NameDate Added / UpdatedFormatLink
Phase 3C Re-evaluation6/14/2016PDFDownload
Central PD&E Noise Study Report – File size 35MB10/20/2014PDFDownload
Signed PDSR (Type2 Cat. Ex.) for North PD&E – File size 46 MB2/11/2014PDFDownload
Signed Type 2 Cat. Ex. for Central PD&E – File size 153 MB2/11/2014PDFDownload
Signed Type 2 Cat. Ex. for South PD&E – File size 31 MB2/11/2014PDFDownload
Design Change Reevaluation for North PD&E2/11/2014PDFDownload
North PD&E Preliminary Engineering Report (Glades Rd. to Linton Blvd.)2/11/2014PDFDownload
Central PD&E Preliminary Engineering Report (1 of 3) (Oakland Park to Glades Rd.)8/13/2014PDFDownload
Central PD&E Preliminary Engineering Report (2 of 3)2/11/2014PDFDownload
Central PD&E Preliminary Engineering Report (3 of 3)2/11/2014PDFDownload
South PD&E Preliminary Engineering Report (Stirling Rd. to Oakland Park)2/11/2014PDFDownload