The Florida Department of Transportation (FDOT) is implementing Phase 3 of the 95 Express Lanes continuing 29 miles north from Stirling Rd. in Broward County to Linton Blvd. in Palm Beach County. The purpose of the 95 Express Lanes is to improve mobility, relieve congestion, provide additional travel options, enhance transit services, accommodate future growth and development in the region, enhance emergency evacuation, and improve system connectivity between key limited access facilities in South Florida. 95 Express is part of a regional network of express lanes that will provide a safe, efficient, and reliable transportation alternative to drivers traveling throughout South Florida.
The Phase 3 project limits were evaluated as three individual Project Development and Environment (PD&E) studies. The studies were conducted from Stirling Rd. to Oakland Park Blvd. in Broward County; from Oakland Park Blvd. in Broward County to Glades Rd. in Palm Beach County; and from Glades Rd. to Linton Blvd. in Palm Beach County. In order to expedite the construction of the 95 express lanes in Southeast Florida, FDOT combined the results of all three studies into Phase 3.The improvements in Phase 3 will be implemented in segments due to funding limitations. The first segment (3A-1 from south of Broward Blvd. to north of Commercial Blvd., and 3A-2 north of Commercial Blvd. to SW 10th St. in Broward County) is under construction. The second segment (3B-1 from south of SW 10th St. to south of Glades Rd.) began construction in early 2018. The third segment (3B-2 south of Glades Rd. to Linton Blvd.) is scheduled for construction in 2020. A key component of Phase 3 is a potential direct connection between northbound and southbound 95 Express and I-595, to and from the west. This direct connect will be included in the Phase 3C limits of 95 Express Phase 3. Segment 3C is the fourth segment with limits from Stirling Road to south of Broward Blvd on I-95 and along I-595 from SR 7/US 441/Turnpike Interchange to I-95. Phase 3C will begin construction in 2019. Additionally, a continuation of Ramp Signaling will be included as part of this project up to Linton Blvd. in Palm Beach County.
Please click here to download the Project Fact Sheet
PROPOSED IMPROVEMENTS & CONCEPTS
File Name | Date Added / Updated | Format | Link |
---|---|---|---|
Phase 3B-2 Summary of Scope – I-95 | 3/19/18 | Download | |
Phase 3B-2 Summary of Scope – Glades | 3/19/18 | Download | |
Phase 3B-2 Summary of Scope – Linton | 3/19/18 | Download | |
Phase 3B-2 Summary of Scope – Clint Moore | 3/19/18 | Download | |
I-95 Express Phase 3 Typical Sections | 8/15/2014 | Download | |
Phase 3C North Improvements | 3/2/2017 | Download | |
Phase 3C South Improvements | 3/2/2017 | Download | |
Phase 3C 595 Improvements | 3/2/2017 | Download | |
Phase 3 Ingress and Egress Points | 3/2/2017 | Download |
RESOURCES
File Name | Date Added / Updated | Format | Link |
---|---|---|---|
Fact Sheet 2018-2-21 | 2/27/2018 | Download | |
Fact Sheet 2017-10-17 | 10/30/2017 | Download | |
Fact Sheet Detailed 2016-09-14 3 Pages | 2/15/2017 | Download | |
Fact Sheet Express Lanes Benefits 2016-10-21 | 11/3/2016 | Download | |
Ramp Signaling Informational Fact Sheet | 4/2/2014 | Download | |
Ramp Signaling Frequently Asked Questions | 4/2/2014 | Download | |
Ramp Signaling Informational Brochure | 4/2/2014 | Download |
PRESENTATIONS and MEETINGS
File Name | Date Added / Updated | Format | Link |
---|---|---|---|
95 Express Phase 3B-2 Public Workshop Presentation 2018-03-14 | 3/19/2018 | Download | |
95 Express Phase 3C Public Workshop Presentation 2017-11-08 | 11/13/2017 | Download | |
95 Express Phase 3C Public Workshop Display – roll plot | 11/13/2017 | Download | |
95 Express Phase 3C Public Workshop Display – roll plot north | 11/13/2017 | Download | |
95 Express Phase 3C Public Workshop Display – roll plot south | 11/13/2017 | Download | |
I-95 Express Phase 3C Public Workshop 2017-11-08 | 10/30/2017 | Download | |
I-95 Express Phase 3C Industry Forum Presentation | 4/25/2017 | Download | |
I-95 Express Phase 3 C Industry Forum Registration List | 4/25/2017 | Download | |
I-95 Express Ph3B Public Workshop Presentation 2016-10-27 | 11/3/2016 | Download | |
95 Phase 3B Summary of Project 2016-10-27 Public Workshop | 11/3/2016 | Download | |
95X3B Express Lanes Entrance Exits | 11/3/2016 | Download | |
Roadway Typical Section 95X3B | 11/3/2016 | Download | |
Roll Plot 953B Clint Moore Public Workshop 2016-10-27 | 11/3/2016 | Download | |
I-95 Express Phase 3B-1 Industry Forum Summary | 6/14/2016 | Download | |
I-95 Express Phase 3B-1 Industry Forum Presentation | 5/17/2016 | Download | |
I-95 Express Phase 3B-1 Industry Forum attendees list | 5/17/2016 | Download | |
I-95 Express Phase 3A Industry Forum Attendees List | 7/24/2014 | Download | |
I-95 Express Phase 3A Industry Forum Presentation | 7/18/2014 | Download |
OTHER RELATED DOCUMENTS
File Name | Date Added / Updated | Format | Link |
---|---|---|---|
South Florida Regional Express Lanes Network Project Status Map | 6/16/2014 | Download |
PROJECT DEVELOPMENT & ENVIRONMENT (PD&E;)
File Name | Date Added / Updated | Format | Link |
---|---|---|---|
Phase 3C Re-evaluation | 6/14/2016 | Download | |
Central PD&E Noise Study Report – File size 35MB | 10/20/2014 | Download | |
Signed PDSR (Type2 Cat. Ex.) for North PD&E – File size 46 MB | 2/11/2014 | Download | |
Signed Type 2 Cat. Ex. for Central PD&E – File size 153 MB | 2/11/2014 | Download | |
Signed Type 2 Cat. Ex. for South PD&E – File size 31 MB | 2/11/2014 | Download | |
Design Change Reevaluation for North PD&E | 2/11/2014 | Download | |
North PD&E Preliminary Engineering Report (Glades Rd. to Linton Blvd.) | 2/11/2014 | Download | |
Central PD&E Preliminary Engineering Report (1 of 3) (Oakland Park to Glades Rd.) | 8/13/2014 | Download | |
Central PD&E Preliminary Engineering Report (2 of 3) | 2/11/2014 | Download | |
Central PD&E Preliminary Engineering Report (3 of 3) | 2/11/2014 | Download | |
South PD&E Preliminary Engineering Report (Stirling Rd. to Oakland Park) | 2/11/2014 | Download |